I'm pre-emptivly backing up my configuration, files and databases to a rented dedicated server so when the time comes for the final backup and sync it won't take too long.
The plan is to:
- power up the rented dedicated server which won't be pulled until the 31st.
- Migrate my sites and data back to that server. (2-3 hours)
- remove the 4 1tb drives, 2 of the 4 gig DDR ECC memory and install them on the new server.
- Load the OS and migrate my site and data to the new server in case the raid set is not identified
- Power down my rented dedicated server and the tower server.
- Packup the tower server with all the left-over bits and pieces(extra raid controllers, memory dimms, cables,etc) and ship them back to me.